Project Details
In November 2016, the K-7 Toll Gate project was completed under the reference of Arel A.Ş. and Kisan A.Ş. The toll booths, produced as steel constructions, are structures that can be easily assembled and disassembled. This feature allows the toll booths to be easily transported to different locations.